product / migrations

    Migrations Between Systems.

    New CRM, new ERP, new billing. Migrate without losing data, history, or integrations.

    the problem

    A poorly executed migration destroys trust. Lost data, broken integrations, confused teams. This is why many postpone necessary migrations.

    What we do

    • Field-to-field mapping old → new
    • AI-powered data cleansing
    • Phased migration with rollback
    • Automated verification
    • Parallel period where applicable
    • Team training
    workflow

    Old → New without trauma

    Old system → extract → map AI + clean AI → load → verify → new system.

    scalor.produto/migracoes
    livev2.026
    Old systemExtractAIMap AIAICleanAILoadVerifyAINew system
    types / cases

    What we build in this area

    CRM → CRM

    Salesforce → HubSpot, Pipedrive → Attio.

    Billing

    Subscriptions without double billing.

    ERP

    Migration with a parallel period.

    Entire stack

    Multiple tools in parallel.

    stack

    Tools and technology

    We're not married to any. We choose the best one for the problem.

    n8nAirbyteFivetranPostgresSupabaseOpenAIdbt
    questions

    Frequently asked questions

    Time?+

    Depends. Typically 2-8 weeks.

    Downtime?+

    Minimized. Ideally zero for users.

    Rollback?+

    Always planned. Snapshot of the old system maintained.